Monday, July 16, 2007

Lumbering along.....

Nearly all the interior walls - both upstairs in the log portion and downstairs in the basement - are framed. This is a view from the great room looking toward the front door. The hallway to the master bedroom and bathroom will run between the two logs near the center of the photo.



There's plywood on the roof and the shade inside is wonderful. We'll be especially grateful for that shade when we start brushing and sealing the interior walls in a week or so. This is the view we'll have from the great room.




Here's a view from the hill behind the house. The front door is to the right side - the back door is to the left side. The slab in the foreground is where the garage will go...eventually. The deck is on the opposite side of the house, facing the street.



Here's the view from the back yard, which is actually more of a side yard. This is our back door which enters into the pantry/laundry room.



And here's the view from the driveway. Kinda pretty, isn't it? Well, we think so. When we were there on Saturday, they were starting the staining/sealing. If you look closely, you can see a darker section where they started the stain by the front door.

Sunday, June 17, 2007

Walls & Stairs & a Deck...OH MY!

The framing is done for the deck (AKA: the man-zone)! Most of the basement walls are also framed and in place.

Steve's checking out the deck...and the view. You'll notice in the far left of the picture that some of the main floor walls are framed and ready to be put into place!

We also have stairs!

This is the view from the hill behind the house. The roof trusses arrive on Tuesday and we hope the roof (and solar tiles) will follow shortly thereafter. We're also working on getting the outside logs washed, sealed, and stained. Once that's done and the roof is on we'll start sanding and sealing the inside log walls.

Wednesday, June 6, 2007

THE LOG STACK!

THE FIRST LOG!

This shows the progress they had made by lunchtime on the first day.


They made AMAZING progress by the end of day one! We ate lunch with the crew and watched the log stack under the white canopies. We needed the canopies for shade on day one (temperatures in the 80s) and for protection from wind and occasional raindrops on day two (temperatures in the 60s).



Here's the placement of the second log of day two!

The logs for the purlins (roof support) were nearly the last logs to be placed. Colby was an awesome crane operator!


Rich and Mike are placing THE LAST LOG!
Here's the view of the front door! (Eventually, there'll be stairs leading to the door so you can come visit!)

Here's an aerial view of the shell of our log home, compliments of Jason, a member of the Treehouse Log Homes crew.

Our best friends, John and Lynn, came to visit and watch on day two.

INSIDE OUR LOG HOME!

So, what's next? Our general contractor gets to get back to work on all the details to finish our new home! We'll keep you posted!

Wednesday, May 30, 2007

WALLS!

The walls are nearly ready for logs to be stacked on top! We excitedly await the log stack on June 4, 5, and 6. Check back next week for photos of the log stack!
We visited the site on Memorial Day and found that our neighbor down the street is quite patriotic.
"Land of the free, because of the brave"

Monday, May 21, 2007

A Beautiful Day in the Neighborhood


As you can see, Sunday was another beautiful day in Garden Valley, CA.

Another beautiful sight: the beginnings of basement walls!

The rest of the foundation slab will be poured Tuesday and the basement walls should be done by Friday.

After that, there are only ten days until the logs arrive!

If you're in the neighborhood, feel free to join us on Tuesday, June 5th to watch the stacking of the logs!

Friday, May 11, 2007

Delays and Visitors

The Good News: The foundation has been poured! The Bad News: It rained last week and we're now in a holding pattern. The rain caused the mason a delay in his previous job, so he hasn't even been to our site yet. There actually hasn't been any new work done at our place in over two weeks. The log stack is still scheduled for June 4, 5, and 6, but the contractors will be working LONG days and weeks to be ready in time. If you're in the area, come join us for the log stack on Tuesday, June 5th!

Our friends, Lynn and John, came to see the site the last weekend of April. We hiked through oak trees, shrubbery (makes you think of Monty Python, doesn't it?), and rocks to the top of the property. Afterwards we went to lunch to celebrate Lynn's birthday at a great little Mexican restaurant in Georgetown, about 10 minutes from our property.

Last Sunday, May 6th, we had more visitors at the site. These visitors were the four-legged variety. Man! They are SO fast and graceful! There were three of them and they seemed to be having a game of follow the leader. By the time I got my camera functioning, one was long gone, but I captured two on film. I suppose once we move into the house and these beautiful creatures begin to eat my garden and flowers I may not be so complimentary of them...but I hope that doesn't happen.
Sorry we haven't posted very often, but there just hasn't been much happening. I imagine we'll be fast and furious here pretty quick...at least that's what we're hoping for!

Thursday, April 5, 2007

ROCKS! (and logs)

These are just some of the rocks that have been removed from the soil. The "hole" where the house will be built is behind where Vanessa is sitting. Steve's car is parked where the garage will go. The contractor plans to pour the concrete foundation (incorporating some of the rocks) by next Friday.

The walls of our log home are done! There is still work to be done on the home in Oregon before they number, dismantle, ship, and reassemble the home on our property...but it is exciting to see it literally taking shape!

The interior of our home! The log stack is scheduled for June 4, 5, and 6. Yes, Vanessa is getting a log stack for her birthday! Cool!

Wishing you all Easter blessings!